Overview
The following training space layout is recommended for optimising the immersive learning experience.
Important: The workspace should be a minimum of 6m x 6m (20ft x 20ft) which is clear of all furniture. The space should not contain large mirrors or highly reflective surfaces and should not be in direct sunlight. |
Key:
A - Hose reel
B - Tie-off point
C - Screen (can be situated anywhere in the training space)
D - Power supply / outlet
E - Branch / nozzle
F - Branch / nozzle tracker
G - Controller
H - VR headset
I - Heat suit
J - SCBA
K - Case 1: Support Case
L - Case 2: SCBA Case
Comments
Please sign in to leave a comment.